Structural Steel Fabrication & Erection |
Structural Steel Fabrication & Erection |
2/13/2023 |
Package Awarded |
Building Concrete/Foundations |
Production Building – Remaining Building Foundations |
3/10/2023 |
Package Awarded |
Exterior Metal Panels & Louvers |
Exterior Metal Panels & Louvers |
3/10/2023 |
Package Awarded |
Mechanical – Package 1 |
Mechanical (Pkg 1: HVAC & Plumbing, Pkg 2: All Misc. Bldgs, Pkg 3: Process Piping/Systems) |
5/5/2023 |
Package Awarded |
Mechanical – Package 2 |
|
5/5/2023 |
Package Awarded |
Mechanical – Package 3 |
|
5/5/2023 |
Package Awarded |
Roofing |
Roofing |
3/10/2023 |
Package Awarded |
Underslab Conduit |
Underslab Conduit |
3/24/2023 |
Package Awarded |
Temporary Site Power |
Temporary Site Power |
3/24/2023 |
Package Awarded |
Elevators |
Elevators |
3/31/2023 |
Package Awarded |
Fire Suppression |
Fire Suppression |
5/4/2023 |
Package Awarded |
Electrical – Package 1 |
Electrical (Pkg 1: High Voltage, Pkg 2: Distribution, Pkg 3: Site Power, Aux Buildings) |
5/5/2023 |
Package Awarded |
Electrical – Package 2 |
|
5/5/2023 |
Package Awarded |
Building Concrete/Foundations |
Building Concrete/Foundations – SOG/SOD |
4/25/2023 |
Package Awarded |
OH Doors & Dock Equipment |
OH Doors & Dock Equipment |
4/24/2023 |
Package Awarded |
Underslab Plumbing & Piping |
Underslab Plumbing & Piping |
5/3/2023 |
Package Awarded |
Sealant, Caulking in SOG |
Sealant, Caulking in SOG |
5/5/2023 |
Package Awarded |
Exterior Framing & Blocking |
Exterior Framing & Blocking |
5/4/2023 |
Package Awarded |
Exterior Doors, Frames, Hardware |
Exterior Doors, Frames, Hardware |
5/4/2023 |
Package Awarded |
Glass & Glazing |
Glass & Glazing |
4/28/2023 |
Package Awarded |
Partial Misc. Metals |
Partial Misc. Metals – External |
5/12/2023 |
Package Awarded |
BMS & Controls |
BMS & Controls |
5/17/2023 |
Package Awarded |
Masonry |
Masonry |
6/23/2023 |
Package Awarded |
Interior OH Doors |
Interior Overhead Doors |
6/23/2023 |
Package Awarded |
Metal Stud & Drywall (Level 1) |
Drywall (Production Level 1) |
6/23/2023 |
Package Awarded |
Metal Stud & Drywall (Level 2) |
Drywall (Production Level 2) |
6/23/2023 |
Package Awarded |
Doors, Frames, Hardware (Interior) |
Interior Doors, Frames, Hardware |
6/23/2023 |
Package Awarded |
Metal Buildings (Support Buildings) |
Pre-Engineered Metal Buildings |
7/19/2023 |
Package Awarded |
Resinous Flooring |
Resinous Flooring |
6/23/2023 |
Package Awarded |
Dry / Clean Rooms |
Dry / Clean Rooms |
6/28/2023 |
Package Awarded |
Glass & Glazing (Interior) |
Interior Glass and Glazing |
7/14/2023 |
Pending Award |
Fire Caulking |
Fire Caulking |
8/3/2023 |
Package Awarded |
General Trades |
General Trades |
8/31/2023 |
Package Awarded |
Painting & Acoustical Caulking |
Painting & Acoustical Caulking |
8/17/2023 |
Package Awarded |
Tiling |
Wall & Floor Tile |
7/14/2023 |
Scope Removed from Project |
Rubber Base |
Rubber Base between wall and floor. Package formerly named VCT & Carpet |
1/31/2024 |
Package Awarded |
Miscellaneous Steel (Interior) |
Interior Misc Metals |
7/28/2023 |
Package Awarded |
Support Building Structural Steel |
Support Building Structural Steel |
8/14/2023 |
Package Awarded |
Fire Alarm |
Fire Alarm |
8/24/2023 |
Package Awarded |
Telecommunications/Technology |
Structured Cabling |
10/18/2023 |
Package Awarded |
Security Systems |
Electronic Security |
10/18/2023 |
Package Awarded |
Food Service Equipment |
Food Service Equipment |
TBD |
Scope Removed from Project |
Support Building Interior Fitout |
Auxillary Building Contractors |
TBD |
Not Issued to Bid |
Landscaping |
Landscaping |
TBD |
Not Issued to Bid |
Site Fencing |
Site Fencing |
5/16/2024 |
Bid Leveling |
Site Concrete Paving |
Site Concrete Paving |
5/16/2024 |
Bid Leveling |
Final Clean |
Construction Final Cleaning |
TBD |
Not Issued to Bid |